San Diego County / Client: Olivenhain Municipal Water District
Pump Station & Fore-bay Tank project includes excavation of 100,000 cubic yards of rock and construction of a 2,935 GPM pump station and 1MG fore-bay tank on a rugged hillside location. The Water Main Extension No. 144 project was the supply line for the Fore-bay Tank. The water main extension project included a cross-country 18” CML&C water main a nd access/maintenance road through rough steep terrain. The 4,038 linear foot pipeline connects the Unit-R Pipeline to the OMWD Pump Station and Fore-bay Tank.
The following services were provided for this Project:
• Design-Build Program Management
• Design review & Costing
• Construction management
• Technical Services
• Quality assurance